A Three Crushing Stage River Stone Crushing Plant Starts Operation
Good news from one of our Southeast Asia overseas client: his 3-crushing stage river stone crushing plant with capacity 100t/h has finally started operation from August 2021. This crushing plant was bought from us at the end of 2019. Main crushing equipment includes a primary jaw crusher, a standard secondary cone crusher and a short head tertiary cone crusher. With such configuration, client can get more sand in the production. After the installation is finished last year, this crushing plant didn’t put into production due to COVID-19 impact. After long time’s waiting, this crushing plant can finally start normal operation from last month. Congrats!